Client
|
Location
|
Project
Name
|
Business
Area
|
Project
Description
|
|
Texaco
|
|
Alder
|
Offshore Pipelines
|
Conceptual design of a 30km, 10 inch pipe in a 12 inch sleeve pipe with ITP Izoflex
insulation for operation at 138°C.
|
|
BP
|
North Sea (UK Sector)
|
Magnus EOR
|
Offshore Pipelines
|
Front-end, detailed and Project Management of a gas transportation system for enhanced
oil recovery
|
|
Shell
|
North Sea (UK Sector)
|
Goldeneye
|
Offshore Pipelines
|
Conceptual design of a gas condensate field in the North Sea.
|
|
Allseas
|
UK
|
Corrib
|
Onshore Pipelines / Offshore Pipelines
|
Multiphase transient operational analysis (OLGA) for the gas condensate, a 30km
pipeline tie-back to shore. Evaluate all aspects of flow assurance including slugging,
thermal transients and operational strategy development.
|
|
Phillips
|
North Sea (UK Sector)
|
Jade
|
Subsea
|
Detail design and review of vendor data for CRA cladding of 16 inch tie-in spool.
Cladding was applied using an a number of techniques including conventional metallurgical
bonding, explosive bonding and weld overlay. The design temperature for this project
was 160°C.
|
|
Texaco
|
North Sea (UK Sector)
|
Erskine
|
Subsea
|
Review of the hydrate mitigation strategy for all anticipated operating scenarios.
|
|
EMC
|
North Sea (UK Sector)
|
Penguin
|
Subsea
|
Conceptual design and cost estimating.
|
|
Dong
|
North Sea (UK Sector)
|
Denmark - UK Inter- connector
|
Offshore Pipelines
|
DONG Naturgas A/S and POGC announced an intention to construct an offshore gas pipeline
in the Baltic Sea to provide gas from Denmark to the domestic Polish market. The
230 km 30" pipeline was routed across through territorial waters of Denmark,
Sweden, Germany and Poland in a water depth range of 0-50m. Environmental issues
proved a major concern in the design as well as the need to conform to legislation
in all four countries. The pipeline was designed in accordance with DNV OS F101
and included a future mid-line connection to allow for potential gas export to other
customers. JPKenny scope of work included detailed design and construction management
for this project.
|
|
Shell
|
Philippines
|
Malampaya
|
Offshore Pipelines
|
The Malampaya pipelines comprise two, 16-inch flowlines, 30km long, between a subsea
manifold in 850m water depth and a shallow water platform, and a 500km 24-inch gas
export pipeline between the platform and a landfall at Batanages in the Philippines.
The export pipeline passes through water depths of up to 650m. As well as the challenges
of deepwater pipeline construction, the pipeline routes pass through areas that
are subject to seismic activity, mud slides and slope instability. J P Kenny performed
FEED engineering, including the preparation and issue of ITT's for the linepipe
and construction contracts, with design concentrating on the confirmation of route
feasibility and the development of limit state design methodologies and acceptance
criteria. J P Kenny's continued involvement has lead to the development of a full
mechanical design of the pipelines and extended to follow-on and construction support
engineering.
|
|
Gov. of Balearics
|
Spain
|
Balearics
|
Offshore Pipelines
|
Flow assurance engineer responsible for evaluating a number of potential gas transmission
scenarios to meet the forecast gas demand. Modelling the hydraulic performance of
each scenario using Pipesim 2000. Recommended the optimum solution based on hydraulic
performance and CAPEX.
|
|
BGE
|
UK - Ireland
|
Gas 2025
|
Offshore Pipelines
|
JPK was part of a consortium of companies including Sofregaz undertaking the preliminary
engineering for the Irish Gas 2025 project. JPK's scope related to route selection
for the Scotland to Ireland Second Interconnector, concept design, PEIA and cost
estimating. Project subsequently continued into detailed design and project management.
|
|
ETPM
|
North Sea (UK Sector)
|
Elgin/Franklin Pipelines*
|
Subsea
|
Expansion and upheaval buckling analysis of HT/HP flowline (185°C/12500 psi)
as part of conceptual design study.
|
|
Smit Land & Marine
|
North Sea (UK Sector)
|
Elgin/Franklin Bundles
|
Subsea
|
Detail design of 5km, 2 off, 12 inch clad pipes in 16 inch sleeves with foam insulation
all a within carrier with installation by mid depth tow. This project includes extensive
testing of the foam at elevated temperatures of up to 160°C. The project also
included testing of clad pipe at elevated temperatures and the use of limit state,
strain based design methods.
|
|
Dangas
|
Denmark - UK
|
South Arne-Nybro Pipleine
|
Offshore Pipelines
|
Detailed finite element analysis of piggable, valved, equal 24" wye. Protection
structure had to resist impact of heavy beam trawlers known to operate in the Danish
Sector of North Sea.
|
|
Conoco
|
North Sea
|
Britannia Field Development
|
Offshore Pipelines
|
Conceptual design of Britannia bundle annular hot water circulation system using
waste heat from the platform
|
|
Allseas
|
North Sea
|
Mallard
|
Subsea
|
Non linear, finite element analysis of pipe in pipe system operating at high temperature
(135°C). Detail design of the pipe in pipe system to resist upheaval buckling
and establish back fill requirements.
|
|
Bord Gais Eireann
|
North Sea (UK Sector)
|
Second Inter- connector
|
Offshore Pipelines
|
Second Ireland-Scotland Interconnector gas pipeline (2002). Detailed Engineering
for marine and onshore sections 192 Km of 30" pipeline.
|
|
Confidential
|
Spain
|
Algerciras Oil Terminal
|
Onshore Facilities
|
Algerciras Oil Terminal, Spain (2002). Preliminary Design for tank farm, marine
reception facilities and site piping.
|
|
BHP / AGIP / Sonatrach
|
Algeria
|
ROD Field Development
|
Onshore Pipelines
|
ROD Field Development, Algeria (2001). Conceptual and Front End Engineering Design
for all pipelines and well head monitoring and control equipment between wells and
Processing Facility.
|
|
AMEC
|
China
|
Veba Oil Field Development
|
Studies
|
An existing gas field at Jingbian and pipeline to Beijing was tied into Review of
upstream assets & potential markets
|
|
BHP/Petrofac
|
Algeria
|
OHANET
|
Onshore Pipelines
|
Steady state and transient hydraulic analysis to determine line sizes and slug frequency
for a major onshore gas field in Algeria
|
|
Sonatrach / Anadarko / AGIP
|
Algeria
|
HBN/HBNS Development
|
Onshore Pipelines
|
HBN/HBNS Field Development, Algeria (1997). FEED for offsite facilities including
production flowlines from wellheads to remote manifolds, production trunkline from
remote manifolds to central processing facility, water and gas injection systems
and water extraction system. A total length of 800 km of 8 to 10 –inch pipelines.
|
|
Confidential
|
China
|
West-East China Gas Pipeline
|
Onshore Pipelines
|
The gas system pipeline started at the Lunnan Terminal in the Tarrim Basin and terminated
at a terminal outside of Shanghai. An existing gas field at Jingbian and pipeline
to Beijing was tied into the West-East pipeline. JPKenny responsibilities were to
perform a review of system design and construction requirements, review of investment
documentation and make recommendations, provision of a basic economic model, and
provision of CAPEX and OPEX expenditure, schedule review.
|
|
Transco
|
UK
|
Horndean to Newells lane Pipeline
|
Onshore Pipelines
|
Horndean to Newells Lane Pipeline, UK (2000). Conceptual Design including routing
and preparation of engineering specifications and construction tender package for
14 Km of 18" pipeline.
|
|
Gifford and Partners
|
UK
|
South Mole Fuel Distribution and Pipeline
|
Onshore Pipelines
|
Gifford and Partners were appointed by the MOD to manage various MOD projects in
Gibraltar. J P Kenny involvement included review of previous investigation, completion
of Design Basis, site visit, input into pipeline s.o.w., review of tenders, review
of EPC design, attendance at commissioning, construction support.
|
|
Air BP
|
UK
|
Gatwick Project - Jet A-1 Fuel Pipeline
|
Onshore Pipelines
|
Gatwick Airport, UK (2000). Feasibility study, detailed routing and engineering
specification for Jet A-1 aviation fuel pipeline, 15 Km of 10 inch pipeline including
740m directional drill.
|
|
BHP
|
Algeria
|
Algeria Oil Field Development
|
Onshore Pipelines
|
Algerian oil field development (2000). Conceptual studies for a development including
400 Km of gas and liquids pipelines.
|
|
BP
|
UK
|
Saltend Pipeline Project
|
Onshore Pipelines
|
Saltend Pipeline, UK (2000). Route selection, conceptual definition, authority liaison
and construction support for a 27 Km 20” gas pipeline.
|
|
Transco
|
UK
|
Middlestoke Minimum Offtake
|
Onshore Pipelines
|
Transco were to provide Minimum off-take facilities to supply Kingsnorth Power Station
in Kent. JPK were involved in detailed mechanical design, materials specification,
detailed civil design, stress analysis to IGE/TD/12, cathodic protection design,
process analysis, C & I control design, procurement assistance, construction
support, third party liaison, chair HAZID/HAZOP studies, BGC/PS/P9 investigations,
participate in risk analysis and detailed electrical enquiry design.
|
|
EE & CC
|
Turkey - Turkmenistan
|
Trans-Caspian Pipeline
|
Onshore Pipelines / Offshore Pipelines
|
Trans-Caspian Pipeline, Turkey to Turkmenistan (1999). Feasibility study for a 2000
Km 48" gas export pipeline running across the Caspian Sea to tie into the Turkish
pipeline system.
|
|
Scott Wilson Kirkpatrick & Co
|
Middle East
|
Multi-Products Berth Mesaieed
|
Onshore Pipelines
|
Preliminary engineering for Mesaieed Multi-products berth.
|
|
AFSC
|
Hong Kong
|
Chek Lap Kok Airport Fuel System
|
Onshore Pipelines / Offshore Pipelines
|
The Provisional Airport Authority (PAA) for the new Hong Kong airport at Chek Lap
Kok have awarded the Aviation Fuel Supply Consortium (AFSC) a franchise for the
supply of furation fuel. As specialist subcontractor to consultants Scott Wilson
Kirkpatrick, provision ofdesign reviewand construction management services for the
pipelines and tank farm.
|
|
Conpet
|
Romania
|
Crude Oil System Rehabilitation
|
Onshore Pipelines
|
Crude Oil System Rehabilitation, Romania (1998). Conceptual and Detailed Engineering
for rehabilitation of 4500km 20 to 28-inch Crude Oil Pipeline System.
|
|
Anadarko Algeria Corp- oration
|
Algeria
|
Oil Field Development
|
Subsea
|
HBN/HBNS Field Development, Algeria (1997). FEED for offsite facilities including
production flowlines from wellheads to remote manifolds, production trunkline from
remote manifolds to central processing facility, water and gas injection systems
and water extraction system. A total length of 800 km of 8 to 10 –inch pipelines.
|
|
TransCanada Pipelines
|
Tanzania
|
Songo Songo
|
Onshore Pipelines / Offshore Pipelines
|
Songo Songo Project, Tanzania (1998). Conceptual Design, route engineering, authority
liaison, materials management and construction support for a 280 km 10-inch Gas
Pipeline.
|
|
Otepi Foster Wheeler
|
Venezuela
|
Sincor Upstream Surface Facilities
|
Onshore Pipelines
|
Otepi Foster Wheeler has been contracted by SINCOR to develop the oil field and
export the crude oil to a planned Synergy pipeline at Petrozuata, about 25Km from
the oil field. Otepi Foster Wheeler has commissioned J P KENNY to perform the basic
engineering for the crude oil and diluent pipeline development.
|
|
Amoco
|
UK
|
Great Yarmouth Power Station Pipelines
|
Onshore Pipelines
|
Great Yarmouth Power Station, UK (1997/8). Conceptual and Detailed Engineering and
construction management for a total of 44km of 6 and 18 inch gas and oil pipelines.
|
|
AIOC
|
Azerbaijan
|
Early Oil Transportation (Western Route)
|
Onshore Pipelines
|
Feasibility study of pipeline export route.
|
|
BP Exploration
|
UK
|
Wytch Farm
|
Onshore Pipelines
|
Wytch Farm, UK (1996). Detailed design and procurement of 8-inch diameter oil pipeline.
|
|
AIOC
|
Azerbaijan / Georgia
|
Caspian Basin Western Export System
|
Onshore Pipelines
|
Caspian Basin Western Export System, Azerbaijan and Georgia (1995-1997). Conceptual
and Detailed Engineering, Authority Liaison and Construction Support for the 920
km 20 to 40-inch oil export pipeline..
|
|
JKX O & G
|
Ukraine
|
Ignatovskoye
|
Onshore Pipelines
|
Preliminary design of export pipeline including infield pipelines.
|
|
Transgas
|
Portugal
|
Portuguese Transmission Network
|
Onshore Pipelines / Offshore Pipelines
|
Portuguese Gas Transmission Network (1995/6). Conceptual and Detailed Engineering
for an 800km 20 and 24-inch gas pipeline.
|
|
Pennzoil / Ramco
|
Azerbaijan / Georgia
|
Caspian Basin Export Pipelines
|
Studies
|
Caspian Basin Western Export System, Azerbaijan and Georgia (1995-1997). Conceptual
and Detailed Engineering, Authority Liaison and Construction Support for the 920
km 20 to 40-inch oil export pipeline..
|
|
PLE
|
Portugal
|
Portuguese Natural Gas Grid
|
Onshore Pipelines
|
800km of transmission and distribution pipelines were to be installed in Portugal
to supply natural gas from Maghreb via Algeria, Morocco and Spain. JPKenny involvement
included configuring the J P Kenny in-house pipeline route engineering and draughting
system, REGIS, to operate with digitised aerial survey data, setting up and supervising
of network 8 CAD workstations in PLE's Lisbon office to perform detailed draughting,
preparing database of pipeline details and preparing designs for directional drill
crossings.
|
|
Pennzoil / Ramco
|
Azerbaijan / Georgia
|
Trans Caucasian Pipeline Project
|
Onshore Pipelines
|
Trans Caucasian Pipeline (1993). Front-end design for 850 kilometre of 48-inch oil
line in the FSU, with various routes to western markets.
|
|
BP
|
UK
|
Dalmeny Terminal Expansion
|
Onshore Pipelines
|
Dalmeny Terminal Expansion, UK (1993). Conceptual and Detailed Engineering and Construction
Support for 4.5 km 36 and 40-inch oil and gas pipelines.
|
|
National Power
|
UK
|
Silk Willoughby / Staythorpe
|
Onshore Pipelines
|
National Power intended to build a new gas fired CCGT Power Station alongside the
existing coal fired station at Staythorpe (Newark) Nottinghamshire. J P Kenny was
commissioned to produce a pipeline route report, complete with necessary safety
and environmental data that could be used as evidence at the inquiry. Additionally
they were required to provide specialist engineers as support to National Power
at the public inquiry.
|
|
Client
|
Location
|
Project Name
|
Business Area
|
Project Description
|
|
Ramco
|
Russia
|
Trans Ural Pipeline
|
Onshore Pipelines
|
Trans Urals Pipeline, Russia (1992). Feasibility study for 6,500 kilometre of 16
inch NGL pipeline.
|
|
BGE
|
Ireland
|
Pipeline Gas Interconnector (Onshore)
|
Onshore Pipelines
|
Gas Interconnector (1991-1993). Detailed design, procurement and construction supervision
of onshore pipelines (80 kilometers of 30-inch diameter) in SW Scotland and Ireland
connected to the offshore pipeline across the Irish Sea.
|
|
Irish Refining PLC
|
Ireland
|
IRC to Cork City Pipeline
|
Onshore Pipelines
|
Feasibility study on techo-economics of the pipeline.
|
|
National Power
|
UK
|
Deeside Power Station - Gas Pipeline
|
Onshore Pipelines
|
As part of the Deeside Power Station Project, J P Kenny were required to establish
a viable route for a high pressure gas pipeline. The pipeline is approximately 18Km
long and included end facilities for launching and receiving pigs, metering, filtering
and pressure control of the gas.
|
|
Arco British Ltd
|
UK
|
Pickerill Field Development - Onshore
|
Onshore Pipelines / Offshore Pipelines
|
Pickerill and Thames, UK (1991). Detailed design, procurement and construction management
of onshore and offshore pipelines.
|
|
Shell Chemicals UK
|
UK
|
North Western Ethylene Pipeline
|
Onshore Pipelines
|
North West Ethylene Pipeline, UK (1990/91). Route Engineering and Detailed Design
for 400km 10-inch dense phase pipeline . The work focussed on the development of
an automated route alignment sheet system which has been ultimately developed into
REGIS, part of the J P KENNY Landscape suite of software.
|
|
Sakhalin Energy Investment Company
|
Japan
|
Sakhalin Development (Specification Preperation for Subsea Pipelines & Appraisal
of Spiral Welded Pipe)
|
Offshore Pipelines
|
JP Kenny were given a contract to assist the pipeline design contractor by developing
the materials specifications and appraise the use and suitability of spiral welded
SAW pipe for the Sakhalin II project and to compare and contrast the product with
longitudinally welded SAW pipe.
|
|
Kinetica
|
UK
|
Yelverton to South Denes Gas Pipeline
|
Onshore Pipelines
|
JP Kenny were required to establish a viable route for a gas pipeline to supply
a new power station at Great Yarmouth in Norfolk.
|
|
Rompetrol
|
Libya
|
NC-115 Development
|
Offshore Pipelines
|
Conceptual design of the oil transportation system.
|
|
bp
|
North Sea
|
Rhum
|
Offshore Pipelines
|
Concept selection and detail design of 3 well HT/HP (130°C /709bar), high CO2,
subsea tie-back to Bruce, includes pipe in pipe, testing of various CRA ( 13% chrome,
316L clad and 904 clad)
|
|
Shell
|
Offshore Nigeria
|
Bonga
|
Subsea
|
Preparation of Field Development Plan, using FOCU$ optimisation tool. Conceptual
design of the field architecture and determination of subsea equipment requirements,
including the conceptual design of flowlines, risers, field manifolds, gas lift
and remote tie-in systems and the development of tender documents, including workscopes
and functional specifications for Xmas trees, manifolds, control system, remote
tie-in systems, flowlines and risers for inclusion in the final EPIC contract enquiry
documents. Major technical issues included: water depth, flow assurance, thermal
insulation of subsea components, steel catenary risers, remote tie-in systems and
installation in restricted seabed areas.
|
|
bp
|
North Sea
|
East Telford Tie-Back
|
Offshore Pipelines
|
East Telford development consists of extended tieback of a single gas lifted production
well (PC) to Central Telford manifold. JP Kenny scope included, subsea flexible
production flowline, flexible gas lift flowline, controls umbilical, controls, manifold,
piping design and management aspects of the detailed engineering and installation
of East Telford.
|
|
bp
|
Egypt
|
Egypt
|
Subsea
|
As lead entity within the London Consultants Team, undertook a feasibility study
to establish technically robust and economically attractive development scenarios
for these two deepwater prospects in the Eastern Mediterranean.
|
|
Shell
|
North Sea
|
Mandarin
|
Subsea
|
Materials selection, detailed design and specification of all production 22% Chrome
duplex tie-in spools and all associated manifold pipework.
|
|
Elf
|
Angola
|
Dalia
|
Offshore Pipelines
|
Subcontracted to ABB Lummus Global for the subsea elements of the Dalia FEED project,
a development consisting of 39 wells. The base case was a subsea development tied
back to an FPSO but an alternative with a surface wellhead platform, plus subsea,
was also evaluated. In addition to costing and cost reduction studies and the development
of specifications for the ITT documentation, responsible for technical aspects including:
flowline configuration and installation option studies (individual, pipe-in-pipe
and bundles), consideration of plastic liners for the water injection flowlines,
spool design and layoutand connection methods. After the completion of the FEED,
Elf retained JP Kenny directly, for some further optimisation work using FOCU$.
Once the base case and cost model was developed, the major benefit of FOCU$ was
demonstrated by developing and optimising alternative options ‘live’,
in a multi-disciplinary workshop.
|
|
Jande Nul
|
Malaysia
|
West Natuna Infield
|
Studies
|
Study of Optimisation blowdown scenario for 400km WNTS pipeline, and recommendation
of preferred location, rate and facility specification.
|
|
BP Amoco
|
North Sea
|
South Everest Field Development
|
Subsea
|
On site supervision of manufacture of 25% chrome superduplex steel tubes at Sandvik’s
Chomutov pipemill in the Czech Republic. Tubes were for inclusion into steel tubed
umbilical for the South Everest field development. Particular attention was focused
on the avoidance of any sigma phase in the final product.
|
|
Exxon
|
Angola
|
Angola Block 15
|
Subsea
|
Conceptual engineering of field layout and cost optimisation.
|
|
Allseas
|
|
Pelican
|
Subsea
|
Materials selection, detailed design and specification of 25% Chrome superduplex
8" production flowline and all associated tie-in spools and manifold pipework.
|
|
B P Exploration
|
North Sea (UK Sector)
|
Magnus
|
Offshore Pipelines
|
Front-end, detailed and Project Management of a gas transportation system for enhanced
oil recovery
|
|
ARCO
|
North Sea
|
North West Bell
|
Subsea
|
Detailed design of a piled Wellhead Protection Structure (WHPS) to protect a single
gas wellhead in 21m water depth - January 1999
|
|
Amerada Hess
|
|
Fife P10
|
Subsea
|
Project management for the design, delivery and installation of Choke Base Manifold.
|
|
Agip
|
Congo
|
Kitina
|
Subsea
|
JP Kenny workscope included two pipeline end manifolds (PLEM), PLEMs named Sounda
and Djambala, tie-ins for three trees at each PLEM, two 6" pipelines with a
piggable loop, several service and gas lift 2" lines, remote controlled gate
valves with ROV overrides, umbilical tie-in to a subsea distribution unit (SDU).
|
|
Woodside
|
Western Australia
|
Lambert Early Tie-back
|
Subsea
|
As part of the Coflexip Stena/J P Kenny Joint Venture, responsible for all engineering,
procurement, management and installation of the Lambert/Hermes Subsea facilities.
The initial scheme, or Early Tie-Back, was a fast-track single well (converted from
a spare Wanaea/Cossack tree), flexible flowline, electrohydraulic controls, umbilical
and a small subsea interface.
|
|
BP
|
Caspian
|
Shah Deniz
|
Offshore Pipelines
|
Responsible for the development of the subsea and pipeline architecture options,
to suit alternative reservoir outcomes and to take account of the significant geo-hazards.
The pipeline network corridors had to have sufficient flexibility to allow for transfer
of fluids from facilities in the eastern, northern, western and southern flanks
of the field while avoiding the geo-hazards to minimise potential risk to the integrity
of the pipelines. A wide range of pipeline diameters were examined for suitability
of transporting multi-phase flow as intrafield pipelines. Hydraulic and layability
analyses were carried out for the oil and gas export pipeline systems. The limitations
of pipelay and construction vessels available in the Caspian were identified and
alternative solutions proposed. Cost estimates were produced and benchmarked.
|
|
Phillips
|
Timor Sea
|
Bayu Undan
|
Offshore Pipelines
|
J P Kenny was commissioned to engineer and prepare a cost estimate for either a
single 30-inch or 2, 26-inch subsea pipelines to transport gas from an offshore
installation to one of several possible landfall sites on the south side of Timor
or Roti Island. A detailed cost estimating model was developed to evaluate the technical
and economic sensitivities of installation by S-lay or J-lay, spool installations,
requirements for SSIV's etc.
|
|
State Energy Commission of Western Australia
|
Western Australia
|
Perth Gas Line Enhancement Study
|
Offshore Pipelines
|
The Dampier - Perth pipeline was assessed to determine its flow capacity. A study
was carried out to determine the various ways which would increase the capacity
of the pipeline system. Various upgrades including increasing the compression capacity
at existing compressor stations, installing additional compressor stations, CO removal,
enriching the gas supply, line looping, alternative gas supplies were all assessed
in terms of technical feasibility, net increase in capacity, cost to implement upgrade
and the project lead time to complete.
|
|
Marathon
|
|
Arnold
|
Offshore Pipelines
|
Detail design of 6 inch pipe in pipe system for reeled pipe lay in deepwater.
|
|
Petrobras
|
Brasil
|
Marlim Field
|
Offshore Pipelines
|
Preliminary routing, hydraulics, wall thickness design, thermal insulation for installation
by reel lay, cathodic protection, static analysis for steel catenary risers, and
installation capability analysis for Reel lay, J-lay, S-lay and bottom tow. After
completion of the conceptual engineering a ± 20% cost estimate was performed which
included a risk analysis.
|
|
Wapet
|
Western Australia
|
Gorgon
|
Onshore Pipelines / Offshore Pipelines
|
Gorgon Pipeline (1996-1997) – Extensive feasibility and preliminary engineering
of a major pipeline system (up to 46") to transport gas to shore and then along
shore to the existing Burrup LNG facilities.
|
|
Chevron
|
North Sea (UK Sector)
|
Alba
|
Offshore Pipelines
|
Detailed design of a Water Injection Flowline between the Alba Northern Platform
(ANP) and the southern end of the Alba field, including a drill centre manifold.
scope of work included the design of 12" flowline (6km), 90te drill centre
manifold assembly (DCMA), riser tie-in, ANP and DCMA approach spools, existing umbilical
I-tube extension, protective routing of umbilical.
|
|
Shell
|
|
Razorbill
|
Offshore Pipelines
|
Conceptual design of pipe-in pipe system for 30km tie back. Development consists
of 2 off 12inch pipe in pipe plus 12 inch water injection tie-back to a platform
30km distant.
|
|
Arco
|
Indonesia
|
Terang - Sirasun
|
Subsea
|
Field layout derivation, conceptual design, cost estimates and schedules.
|
|
Shell
|
North Sea
|
Curlew
|
Subsea
|
The work undertaken was the tie-in of a new production well into the field existing
infrastructure. Design to provide for optimum arrangement depending on well testing
results. Scope of work consisted of design and supply of tee assembly c/w two hydraulic
actuated valves and manual chemical injection valve (free issue valves), tee unit
for crossover jumper upgrade, adjustable supports to enable tie-in to existing tree
spools, hydraulic function interface plate, revise existing field drawings to 'As-Built'.
|
|
BP
|
North Sea (UK Sector)
|
Magnus EOR Retrofit Riser /SSIV
|
Subsea
|
JPK provided engineering from concept through to Installation. A wide range of alternative
riser concepts were evaluated during the feasibility study. The study covered potential
re-use of existing caissons, new build risers constructed piecemeal (topsides habitat
welding) to a single complete externally mounted multiple riser caisson.
|
|
Hamilton Oil Company
|
North Sea
|
Johnston Field Development
|
Offshore Pipelines
|
Conceptual engineering.
|
|
Woodside
|
Western Australia
|
Wanaea / Cossack
|
Offshore Pipelines
|
Developed repair and recommissioning documentation for the Wanaea Cossack pipeline
as part of Woodside's subsea risk management strategy.
|
|
Shell
|
|
Nelson Subsea Development
|
Subsea
|
Advanced light life cluster manifold
|
|
Marathon
|
North Sea (UK Sector)
|
East Brae Field
|
Subsea
|
Detailed finite element analysis of piggable equal wye.
|
|
Phillips
|
|
Ann Gas Field Development
|
Subsea
|
Jack-up installed drilling template, manifold and protection structure
|
|
Ranger
|
North Sea (UK Sector)
|
Anglia 'B' Development
|
Subsea
|
Conceptual study of field development options.
|
|
BP
|
|
Don Field Phase II Development
|
Offshore Pipelines
|
Large deflection, high temperature, buried, upheaval buckling, finite element analysis.
|
|
Client
|
Location
|
Project Name
|
Business Area
|
Project Description
|
|
Arco
|
North Sea (UK Sector)
|
Welland Field
|
Subsea / Offshore Pipelines
|
The Welland Gas Field is situated about 20Km Southeast of the Thames Complex in
the Southern sector of the North Sea. J P Kenny provided the detailed design, engineering
and procurement support for the export pipeline, flowline and umbilical system.
J P Kenny's responsibilities also extended to the tie-ins and expansion loops pipeline
and cable crossings; and scour protection measures.
|
|
BP
|
North Sea (UK Sector)
|
Buchan Alpha
|
Subsea
|
The Buchan Aplha floating production facility is located in Block 21/1 of the UK
Sector and currently produces from eight wells. Main contractor services for the
9th Well Tie-In project covering detail engineering design, procurement fabrication
supervision and construction support for the offshore installation activities.
|
|
BP
|
North Sea
|
UKCS CNS FPSO Project
|
Subsea
|
Conceptual field layout development.
|
|
Arco
|
UK
|
Thames Complex Pipelines System
|
Offshore Pipelines
|
Use of large deflection, finite element stability analysis to demonstrate tensions
induced in the pipeline under storm conditions were sufficient to limit lateral
deflections to acceptable limits.
|
|
Occidental
|
North Sea (UK Sector)
|
Scapa Field Development
|
Subsea
|
The Scapa Field, North Sea UK Sector is located in 117m water depth. Occidental
have developed this field by the installation of a subsea production template linked
to the Claymore Field, 4.5Kmdistant, with newtopsides facilities installed on the
Claymore
|
|
AIOC
|
Azerbaijan
|
Azeri Chirag Gunelshi (ACG)
|
Offshore Pipelines
|
As prime design contractor JPK performed all detailed design work up to the successful
installation of each phase.
|
|
ITP
|
Central Peru
|
Camisea
|
Offshore Pipelines
|
The Camisea Offshore Loading System is part of the overall Camisea Project that
extracts natural gas in the San Martin and Cashiriari gas fields in the Camisea
region, central Peru. JPK was contracted by ITP Interpipe to provide inplace design
services for four subsea pipelines and a power umbilical from the Pisco Fractionation
and Topping Facility on the Peruvian Pacific coast to a marine berthing facility
approximately 3 kilometres offshore in 15 metres of water in the Pisco Bay.
|
|
Main Line Pipelines
|
UK
|
M60 Jn 8 Diversion
|
Onshore Pipelines
|
The existing 12" mainline pipeline, operated by Esso, was to be affected by
plans to widen the M60 near to junction 8 in Manchester. A diversion of the existing
pipeline was agreed with the Highways Agency. J P Kenny was appointed to provide
design services, construction management services and act as planning supervisor
for the proposed diversion
|
|
BP Exploration
|
>UK
|
Clair Onshore
|
Onshore Pipelines
|
Clair Field Development, UK (2003). Detailed Design for the onshore section of the
Clair Field subsea pipeline to Sullom Voe Terminal.
|
|
J&P
|
Libya
|
Elephant Field Development
|
Subsea
|
Elephant Field Development, Libya (2003). Review of Front End Engineering &
Design.
|
|
Marathon
|
Norway / UK
|
Symphony
|
Offshore Pipelines
|
Hydraulic and transient analysis for a major offshore gas trunkline from Norway
to the UK.
|
|
British Gas Trinidad and Tobago Ltd.
|
Trinidad and Tobago (Gulf of Paria)
|
ECMA FEED
|
Subsea
|
JP Kenny and Mustang Engineering Inc. have formed an integrated team for the development
of British Gas Trinidad and Tobago ECMA Front End Engineering Design (FEED) Project.
The objectives of the FEED Project are to engineer/design the sub-sea system, riser
and J-tube requirements, topside facility modifications, and the development of
a cost estimate.
|
|
Murphy Exploration & Production Company
|
|
Seventeen Hands
|
Subsea
|
Conceptual study to select method to produce marginal field. Selected scenario use
subsea completion flowing through existing subsea manifold.
|
|
BP
|
Trinidad and Tobago
|
Bombax Pipeline
|
Offshore Pipelines
|
Define stage engineering for 48-inch natural gas pipeline located offshore Trinidad
|
|
Samedan
|
US Northern Gulf
|
Lost Ark
|
Subsea
|
JPK was retained as the engineering consultants for flow assurance analyses, and
have focused on well fluid transportation issues, including chemical injection requirements
to prevent hydrate formation during well start-up in 900 metre water depth.
|
|
Woodside Energy Ltd
|
Western Australia
|
Echo Yodel
|
Offshore Pipelines
|
Concept screening during the Select Phase for the subsea system, which included
examination and costing of options for the line pipe, installation, subsea trees
and control system. Subsequent to this, during the Develop and Execute Phase, J
P Kenny were responsible for FEED to obtain overall budget and detailed design of
the subsea pipeline, control system, SSIV, Caisson riser and retrofit clamps.
|
|
Woodside Energy Ltd
|
Western Australia
|
Scott Reef Brecknock
|
Subsea
|
Development and screening of subsea architectures for each field, export pipeline
routing, cost estimates, cost optimisation for deviated wells verses tie-back of
vertical wells.
|
|
BP
|
Gulf of Mexico
|
Marlin
|
Subsea
|
Participated as member of Operator project team for subsea tiebacks in Marlin Field,
Nile Field, and King Field. Each included specification and procurement of subsea
equipment, and King included contraflow heated Pipe-In-Pipe flowline system.
|
|
Shell (Enterprise Oil)
|
Gulf of Mexico
|
Llano
|
Offshore Pipelines
|
Participated as member of Operator project team in conceptual planning for phased
field development using a subsea tieback to an existing host TLP, through development
of FEED tender. HPHT application for Pipe-In-Pipe.
|
|
BP
|
Trinidad
|
Aspen
|
Offshore Pipelines
|
As part of the early evaluation team, JPK assessed the tie-back options for BP's
Aspen Development, location in 900 metres water depth. Multiple flow simulation
runs were used to optimise the flowline design, chemical requirements and insulation
requirements.
|
|
Shell
|
Gulf of Mexico
|
NaKika
|
Offshore Pipelines
|
Participated as part of Operator's project team responsible for export pipeline
design and installation (gas and oil export).
|
|
ExxonMobil
|
Australia
|
Marshall / Madison / Mica
|
Subsea
|
Participated as member of Operator project team implementing deepwater technology
ranging from top-tensioned risers to PLETS/PLEMS and field installation services.
|
|
BG Group
|
Nigeria
|
Pipavav
|
Offshore Pipelines
|
Feasibility study of offshore pipeline corridors including management of route survey
and development of cost estimates.
|
|
Britannia Operator Ltd
|
Nigeria
|
Britannia Gas Export Pipeline
|
Offshore Pipelines
|
Dynamic, time domain, finite element stability analysis using AGA software to optimise
concrete coating requirements in near shore zones.
|
|
Texaco
|
Gulf of Mexico
|
Erskine Replacement
|
Offshore Pipelines
|
Detail design of a 16 inch inner pipe in a 20 inch outer pipe with Logstor Ror PU
foam insulation. This project included analysis of the pipe in pipe behaviour using
SIMULTOR, design of a cooling spool, design of pipe in pipe tie-in spools, limit
state design of the field joints and FE analysis of the bulkheads. The design temperature
for this project was 140°C.
|
|
Woodside Energy Ltd
|
Gulf of Mexico
|
Laminaria & Corallina
|
Subsea
|
Project management of subsea facilities development, field layout development, equipment
selection, specification, procurement, flowline design, specification, Interface
management, flow assurance, Installation supervision, commissioning.
|
|
Woodside Energy Ltd
|
Gulf of Mexico
|
Lambert Full Field Development
|
Subsea
|
As part of the Coflexip Stena/J P Kenny Joint Venture (CSK), JPK was responsible
for all engineering, procurement, management and installation of the Lambert/Hermes
Full Field Development Subsea facilities.
|
|
BP Indonesia
|
Gulf of Mexico
|
Terang Sirasun
|
Studies
|
Feasibility study for Floating Gas Production System.
|
|
Talisman
|
Indonesia
|
Beatrice
|
Offshore Pipelines
|
FEED to investigate all considered options for the reconstitution of the Beatrice
oil export pipeline system to identify the most suitable. Detailed design of 59km
16" replacement pipeline section, including tie-ins to remaining sound sections
of existing export pipeline utilizing mechanical connector technology. Provision
of project engineering and technical assistance to Talisman throughout procurement
and offshore phases of project
|
|
Talisman
|
London
|
Kildrummy
|
Offshore Pipelines
|
Materials selection, preliminary design and specification of 8" 22% Chrome
duplex 8" production spur flowline.
|
|
Shell
|
London
|
Skua
|
Offshore Pipelines
|
Materials selection, detailed design, procurement and specification of all 25% Chrome
duplex 6 inch production tie-in spools.
|
|
Shell
|
London
|
Penguin HIPPS
|
Subsea
|
The scope encompassed four subsea drill centers, piping manifold structures. DC2
- 104 tonnes, DC3 – 143 tonnes, DC4 - 97 tonnes, DC5 - 104 tonnes, four identical
subsea controls structures, weight per structure - 43 tonnes, SSIV Structure and
Valves, weight - 67.5 tonnes
|
|
Shell
|
Indonesia
|
Scoter
|
Subsea / Offshore Pipelines
|
The scope included 12" Production pipeline 11.7km long from Scoter Manifold
to Shearwater 'A' Wellhead platform, Control Umbilical from Shearwater to Scoter
Manifold, 12" Tie-In Spools at Scoter and Shearwater,- 6" Tie-In Spools
from Scoter Wells. JPK was responsible for the detail design of the Scoter Riser
at Shearwater and the Scoter Manifold direct with Shell UK Limited under a different
contract
|
|
Nam
|
North Sea
|
L5 Brace Replacement
|
Subsea
|
JPK acted on behalf of NAM in selecting a methodology to reinstate the platform
jacket structure to the asbuilt requirements. Workscope comprised structural engineering
studies of three options including identifying scope of work, hazard and safety
evaluation, total project management and preparation of tenders, liaise with certifying
authority in meeting, necessary certification requirements, fatigue and fracture
analysis of repaired areas, provision of welding engineering, diving representation,
manage the offshore contractors, including client representation offshore.
|
|
Amerada Hess
|
North Sea
|
Angus
|
Subsea
|
Provided engineering design support for evaluation of subsea jumper system performance
under break-away load conditions utilising Finite Element Analysis (FEA), subsea
initiation PLEM system design and FEAs of PLEM stress joints and semi-catenary riser
hang-off assemblies.
|
|
Amerada Hess
|
North Sea
|
East Telford
|
Subsea
|
Materials selection, detailed design and specification of all 22% Chrome duplex
6 inch production and 2 inch gas lift manifold pipework and associated tie-in spools.
|
|
Amerada Hess
|
North Sea
|
Scott Umbillicals
|
Offshore Pipelines
|
Several short flowlines in the Scott Field were displaying evidence of significant
and progressive axial movement, in some cases threatening the integrity of connected
spoolpieces.
|
|
BP
|
North Sea
|
Greater ETAP
|
Asset Management
|
Provision of asset management services to ETAP asset via UTG.
|
|
BP
|
North Sea
|
Forties Re- development
|
Subsea
|
Material selection study for range of flowlines intended for production, produced
water injection, gas lift, CO2(liquid) injection, CO2(liquid)
import service.Materials considered included 22% Cr and 25% Cr Duplex, weldable
martensitic 13% Cr, and both mechanically and metallurgically bonded CRA clad/lined
linepipe.
|
|
Stolt Offshore
|
North Sea
|
Beauly
|
Subsea
|
Scope included single gas lifted production well tieback to existing Balmoral subsea
template, 6" carbon steel production flowline - 5.2kmlength, 2" gas Lift/Methanol
pipeline, control Umbilical.
|
|
Coflexip Stena
|
North Sea
|
Texaco Galley G5
|
Subsea
|
Materials selection, detailed design and specification of all 25% Chrome superduplex
production and gas lift manifold pipework and all associated tie-in spools.
|
|
DRIL-QUIP
|
North Sea
|
Conoco CMS III
|
Subsea
|
Materials selection, detailed design and specification of all production 22% chrome
duplex pipework associated with wellhead protection structures.
|
|
DRIL-QUIP
|
North Sea
|
Conoco Vixen Protection Structures
|
Subsea
|
Detailed design of a piled Wellhead Protection Structure (WHPS) to provide protection
to a single wellhead - October 1999.
|
|
EMC
|
North Sea
|
Shell Penguin Pipelines
|
Offshore Pipelines
|
Conceptual and Detail design of a 60km, 16 inch pipe in a 22 inch sleeve pipe with
Logstor PU insulation for operation at 110°C. This HT/HP project includes development
of a snaked pipe in pipe design. The pitch of the buckle sites is such as to control
expansion site feed-in and tendency for local buckling. The HOTPIP JIP strength
base acceptance criteria is being applied. The probability of buckle formation is
being calculated using a reliability based method.
|
|
Brovig
|
North Sea
|
Flare Pipe Detailed Design
|
Offshore Pipelines
|
Detailed design and fabrication of 18" gas line from flange of the knockout
drum to flare tip flange, 4" drain line from the flange of closed drain vessels
to flare tip flange, trunnion type deadweight support for 18” line to transfer
total weight of pipework within flare tower onto flare boom horizontal bracings
at EL+38.77 above deck level, piggyback supports for 4" line against 18”
at approximately 5m intervals.
|
|
TFE
|
|
Electric Heating Study
|
Studies
|
Study of technical feasibility of electric heating by means of the ITP pipe in pipe
system for a 35km pipeline in 2500m. Scope included assessment of topsides power
requirements, power cable configuration, pipe in pipe configuration, installation
feasibility, system reliability, CAPEX and OPEX assessment.
|
|
BP Egypt
|
Egypt
|
Deepwater Gas Development Feasibility Study
|
Subsea
|
Establish subsea architecture, technical feasibility and cost estimates for deepwater
subsea development plus 90km tie-back to onshore plant. Identify HSE concerns, technology
gaps and risks.
|
|
BP
|
Northern Gulf of Mexico (US)
|
Atlantis
|
Subsea
|
During Select and Define phase responsibilities included development of CTRs and
concept selection, interface management for topsides, floating system and subsea
tieback teams. During FEED responsibilities included co-ordinating issue resolution
activities, schedule compliance and interface co-ordination.
|
|
BP
|
Northern Gulf of Mexico (US)
|
Holstein Project
|
Asset Management
|
Responsibilities included facilitating the monitoring of actual expenditures and
preparation of cost reports, technical integrity assurance, timescale management
to enable the start-up at the earliest date, managing resources to deliver minimum
cost and well system interface management.
|
|
BP
|
Northern Gulf of Mexico (US)
|
Mad Dog
|
Subsea
|
Concept selection for both wet and dry development scenarios, development of field
architecture, evaluation of horizontal verses vertical trees and cost estimates
for both options.
|
|
Kerr McGee Oil and Gas Corp.
|
Northern Gulf of Mexico (US)
|
Gunnison Subsea Development
|
Subsea
|
Verification of conceptual design of the field architecture by performing flow assurance
simulations and system engineering.
|
|
Woodside Energy
|
Western Australia
|
Vincent Enfield Development
|
Subsea
|
Conceptual design and feasibility assessment of the subsea facilities for both Vincent
and Enfield including subsea trees, risers (flexible and rigid), umbilicals and
cost estimates.
|
|
AGIP KCO
|
Kazakhstan (route west)
|
Rail Transportation Study for Oil, LPG and Sulphur Export
|
Studies
|
Identifications of Options for export volumes and corridors with consideration given
to bottlenecks and other capacity constraints. Site visit was undertaken to further
define the Scope Definition of Development Options. The assessment of Construct-ability,
Standards and Regulatory Issues associated with the development requirements.
|
|
Encana
|
Canada
|
Fracture Mechanics Analysis of Deep Panuke Jacket
|
Subsea
|
JPK reviewed design briefs for the Deep Panuke Jacket and developed a methodology
for fracture mechanics analysis.
|
|
ADCO
|
Middle East
|
Condition Assessment of Thanama C Trunklines
|
Offshore Pipelines
|
P KENNY were commissioned by ADCO to carry out a condition assessment of specific
aspects of the Thamama C gas gathering system (Bab field); trunklines numbers 1,2,3
and 4.
|
|
Rosen Europe
|
Iran
|
Fittness - For - Purpose Assessment of 32" Iranian Sour Gas Pipeline
|
Offshore Pipelines
|
The 82-km long 32” diameter pipeline, from Pazanan Agha Jari to Maroun Gas
Injection Station, was inspected between May and August 2003 by ROSENEUROPE using
their corrosion detection pig (CDP) Following the inspection, the client requested
Fitness for Purpose (FFP) assessment of the defect data from the CDP. J P KENNY
were given a contract to conduct the FFP assessment of the pipeline.
|
|
Petrodar Operating Company
|
Sudan
|
Melut Basin Oil Development Project
|
Onshore Pipelines
|
J P Kenny was contracted by PDOC to undertake front end studies, environmental impact
assessment, pipeline routing, conceptual design and basic engineering for the complete
export pipeline, pump and heater stations and marine terminal.
|
|
Amerada Hess Limited
|
|
Scott Flowline Remedial Works
|
Offshore Pipelines
|
Several short flowlines in the Scott Field were displaying evidence of significant
and progressive axial movement, in some cases threatening the integrity of connected
spool pieces. The scope involved creating a model to simulate creeping movement
and utilizing it to quantify the rate of movement and identify the mechanism causing
the movement, evaluation of various remedial measures to prevent further flowline
movement with rock dumping being selected as the best option, design of a rock berm
capable of preventing flowline axial movement, evaluation of rock dumped flowlines
for upheaval buckling.
|
|
ITP Interpipe
|
Plus Petrol
|
Camisea Offshore Loading System
|
Offshore Pipelines
|
JPK was contracted by ITP Interpipe to provide inplace design services for four
subsea pipelines and a power umbilical from the Pisco Fractionation and Topping
Facility on the Peruvian Pacific coast to a marine berthing facility approximately
3 kilometres offshore in 15 metres of water in the Pisco Bay.
|
|
Southern Water
|
UK
|
Cross Solent Water Main Repair Project
|
Offshore Pipelines
|
J P Kenny were awarded the lead consultant role by Southern water responsible for
overall project management of the repair, procurement of a 600m section of flexible
pipe and end fittings, survey of the seabed prior to mobilisation of anchored vessels,
diving operations, tie-in operations, testing operations and recovery of the damaged
pipe.
|